gm   GM Shanghai / China

A new assembly hall will be build in the already existing GM Shanghai plant Yantai (Plant DY). The so called „New General Assembly-Shop DYIII", a complete new final assembly, will be realized by the end of next year.  ROFA will deliver a heavy duty EMS (chassis line) and an AGV system for power trains, as well as the marriage with mechanical and electriacal scope. The marriage takes place synchronously and continuously. The AGV are inductively applied to the system and inductively guided.

The scope includes:

Chassis line:
- 73 EMS vehicles with lifting mechanism
- ca. 900 m EMS track
- 3 switches

AGV / marriage:
- 15 AGV vehicles incl. on-build lifting table
- ca. 110 m AGV track