bmw   BMW Shenyang / China

ROFA will deliver a heavy duty EMS with lifting unit (approx. 3 m lifting height) for BMW Shenyang / China. As an interim solution the EMS will increase the procuction capacity of the E90. The realization period of 14 weeks from commissioning to trial operation is extremly short.

The scope includes portal steel work, 6 vehicles with lifting unit, approx. 120 m EMS rail, 1 lock out switch.