daimler   New heavy duty EMS for Daimler Wörth

ROFA received the order to deliver a heavy duty EMS KB 240 (twin rail) for the transport of truck cabins.

The scope incluces:

1. development of a new lifting carrier with the following components:
- safety concept and risk analysis
- scissors lifting carrier

2. revision of carrier concept:
- revision of the safety concept of the vehicle
- general overhaul of the vehicles
- implementation of new components

3. installation of a sample with complete operation check

4. modification and commissioning of all 18 vehicles and carriers in the system

5. risk analysis and following modification of a maintenance unit