gm   New oder by GM Poland

ROFA received the order to realize the new conveying technique of the body shop of GM FSO in Warsaw.
This plant will produce four upcoming new models of GM and the FSO plant will therefore being modernized . ROFA, as "system integrator" will install and automatize the total scope, existing of 96 roller conveyors, 8 turn tables, 2 scissors lifting tables and 5 drop lifters. In addition two new EMS of type KB180 for the transport of side panel (l/r) will be realized.
The interface between conveying level and welding line will be realized by lifting stations (4 piece). GM global standards apply to both systems. Cycle time of the conveying systems is 60".

Completion will be in July 2007.