daimler   New door line for Daimler Chryler's Bremen

Because of the very good launch of the ROFA heavy duty EMS in Bremen, DaimlerChrysler decided again for ROFA quality for their new door line. A total of 800 m system on two levels, whereas assembly on first floor and handling and connection on second floor, will be realized. The system also includes 70 vehicles, one lifting station, 104 m dragline and for tranfer to the rollerconveyor technology of the existing door storage two transfer vehicles and four cross shuttles from the skillet platform in/off the carrier. SOP will be in beginning of January 2006.