kia   Body & Press Shop for KIA Zilina / Slowakia

Among the voluminous project the bodyshop scope includes several electrified monorail systems type KB180 for the transport of e.g. side panels, roof, cockpit, fender, etc. with a total of 97 vehicles and a conveying line of 1,495 m. Additionally a skid handling system with roller conveyors, chain- and belt technology, as well as two high rack systems will be realized. Among the press shop scope are two electrified monorail systems also type KB180 with 72 trolleys, a conveying line of 845 m and a high rack storage area. SOP will be in July 2006.